drains to the river
2018
house paint on concrete and iron
24 x 24 x 6 inches
corner of South S St. and Greenwood Rd. in Fort Smith, AR
drains to the river was an installation project created in conjunction with Keep Fort Smith Beautiful’s initiative, “Project Drainbow.”
this piece was made with the intention to deter litter and encourage the reuse, reduction, and recycling of trash.
this project would not have been possible without the help and mentorship of (Mr.) David King.